Qiedaea HC-C d13-0 [#8245806963]
This system is located at:
-10693.71875
/ -972.4375
/ -5051.15625
Galactic coordinates:
R: 11,866.568 / l: 115.284 / b: -4.701
Equatorial coordinates:
Right ascension: 23h 54m 32.864s /
Declination: 57° 19'26.375''
Reserve level: Pristine
Habitable zone:
Metal-rich body (2 to 41 ls), Earth-like world (639 to 958 ls), Water world (524 to 2,029 ls), Ammonia world (1,325 to 3,607 ls), Terraformable (498 to 993 ls)
Estimated value: 56,978 cr
System | Distance | Submitted by | Calculated | |||
---|---|---|---|---|---|---|
Schee Eaec JL-W a56-0 | 4,355.62 ly |
Irisa Nyira 23/01/2024 01:05 |
4,355.62 ly | |||
Schee Eaec JK-C d14-39 | 3,542.44 ly |
Irisa Nyira 24/01/2024 22:20 |
3,542.44 ly | |||
Schee Eaec JI-Z a13-0 | 4,192.95 ly |
Irisa Nyira 21/01/2024 20:45 |
4,192.95 ly | |||
Schee Eaec JI-X b7-0 | 4,064.59 ly |
Irisa Nyira 21/01/2024 20:45 |
4,064.59 ly | |||
Schee Eaec JI-P b53-2 | 4,271.62 ly |
Irisa Nyira 24/01/2024 22:21 |
4,271.62 ly | |||
Schee Eaec JH-S d5-14 | 4,306.40 ly |
Irisa Nyira 22/01/2024 23:14 |
4,306.40 ly | |||
Schee Eaec JH-S a72-0 | 3,186.15 ly |
Irisa Nyira 22/01/2024 22:44 |
3,186.15 ly | |||
Schee Eaec JH-K b42-0 | 4,156.62 ly |
Irisa Nyira 24/01/2024 22:21 |
4,156.62 ly | |||
Schee Eaec JG-Z b6-0 | 3,704.20 ly |
Irisa Nyira 21/01/2024 17:20 |
3,704.20 ly | |||
Schee Eaec JG-L a76-1 | 3,273.75 ly |
Irisa Nyira 22/01/2024 23:14 |
3,273.75 ly | |||
Schee Eaec JG-G c13-1 | 3,280.07 ly |
Irisa Nyira 21/01/2024 22:58 |
3,280.07 ly | |||
Schee Eaec JE-M b13-0 | 3,963.96 ly |
Irisa Nyira 21/01/2024 22:58 |
3,963.96 ly | |||
Schee Eaec JC-K b42-2 | 4,120.13 ly |
Irisa Nyira 24/01/2024 22:21 |
4,120.13 ly | |||
Schee Eaec IZ-N a47-0 | 3,746.76 ly |
Irisa Nyira 21/01/2024 20:11 |
3,746.76 ly | |||
Schee Eaec IZ-E c28-3 | 3,185.37 ly |
Irisa Nyira 24/01/2024 22:21 |
3,185.37 ly | |||
Schee Eaec IU-G a106-2 | 4,251.65 ly |
Irisa Nyira 24/01/2024 22:21 |
4,251.65 ly | |||
Schee Eaec IS-X a69-0 | 4,039.20 ly |
Irisa Nyira 23/01/2024 01:30 |
4,039.20 ly | |||
Schee Eaec IS-E c14-2 | 4,204.94 ly |
Irisa Nyira 23/01/2024 01:06 |
4,204.94 ly | |||
Schee Eaec IO-Y a41-0 | 3,736.67 ly |
Irisa Nyira 21/01/2024 22:58 |
3,736.67 ly | |||
Schee Eaec IN-C a81-0 | 3,818.11 ly |
Irisa Nyira 24/01/2024 22:20 |
3,818.11 ly | |||
Schee Eaec IM-Y c3-1 | 4,138.33 ly |
Irisa Nyira 21/01/2024 20:45 |
4,138.33 ly | |||
Schee Eaec IM-P a46-2 | 3,271.44 ly |
Irisa Nyira 21/01/2024 22:58 |
3,271.44 ly | |||
Schee Eaec IM-E c14-1 | 3,085.78 ly |
Irisa Nyira 21/01/2024 22:58 |
3,085.78 ly | |||
Schee Eaec IL-O b26-1 | 4,027.99 ly |
Irisa Nyira 22/01/2024 23:14 |
4,027.99 ly | |||
Schee Eaec IL-H a37-0 | 4,185.45 ly |
Irisa Nyira 22/01/2024 22:44 |
4,185.45 ly | |||
Schee Eaec IL-A c3-2 | 4,382.14 ly |
Irisa Nyira 21/01/2024 20:11 |
4,382.14 ly | |||
Schee Eaec IJ-W a1-0 | 3,748.13 ly |
Irisa Nyira 21/01/2024 17:20 |
3,748.13 ly | |||
Schee Eaec IH-S d5-21 | 4,249.71 ly |
Irisa Nyira 22/01/2024 23:14 |
4,249.71 ly | |||
Schee Eaec IG-Z b6-0 | 3,679.78 ly |
Irisa Nyira 21/01/2024 17:20 |
3,679.78 ly | |||
Schee Eaec IG-X b21-0 | 3,918.66 ly |
Irisa Nyira 22/01/2024 22:44 |
3,918.66 ly | |||
Schee Eaec IF-W a1-1 | 3,970.49 ly |
Irisa Nyira 21/01/2024 17:20 |
3,970.49 ly | |||
Schee Eaec IF-V a84-0 | 3,388.31 ly |
Irisa Nyira 23/01/2024 01:05 |
3,388.31 ly | |||
Schee Eaec IE-C c2-1 | 3,544.54 ly |
Irisa Nyira 21/01/2024 17:20 |
3,544.54 ly | |||
Schee Eaec ID-Q d6-5 | 3,585.66 ly |
Irisa Nyira 22/01/2024 22:45 |
3,585.66 ly | |||
Schee Eaec ID-Q d6-0 | 3,583.42 ly |
Irisa Nyira 22/01/2024 22:45 |
3,583.42 ly | |||
Schee Eaec ID-H a92-1 | 3,577.40 ly |
Irisa Nyira 24/01/2024 22:20 |
3,577.40 ly | |||
Schee Eaec IC-X c4-0 | 4,125.31 ly |
Irisa Nyira 21/01/2024 20:45 |
4,125.31 ly | |||
Schee Eaec IB-R a59-0 | 3,725.33 ly |
Irisa Nyira 22/01/2024 23:14 |
3,725.33 ly | |||
Schee Eaec HY-D a39-0 | 4,348.23 ly |
Irisa Nyira 22/01/2024 23:14 |
4,348.23 ly | |||
Schee Eaec HT-I a105-1 | 4,313.41 ly |
Irisa Nyira 24/01/2024 22:21 |
4,313.41 ly | |||
Schee Eaec HR-P a101-2 | 3,459.50 ly |
Irisa Nyira 24/01/2024 22:21 |
3,459.50 ly | |||
Schee Eaec HR-N c22-0 | 3,197.46 ly |
Irisa Nyira 23/01/2024 01:05 |
3,197.46 ly | |||
Schee Eaec HR-H b2-0 | 3,505.76 ly |
Irisa Nyira 21/01/2024 17:20 |
3,505.76 ly | |||
Schee Eaec HQ-X b20-0 | 3,198.58 ly |
Irisa Nyira 21/01/2024 20:45 |
3,198.58 ly | |||
Schee Eaec HP-Z a54-1 | 3,158.38 ly |
Irisa Nyira 21/01/2024 22:58 |
3,158.38 ly | |||
Schee Eaec HD-Z d1-1 | 3,341.67 ly |
Irisa Nyira 21/01/2024 17:20 |
3,341.67 ly | |||
Schee Eaec HC-X c4-1 | 4,089.38 ly |
Irisa Nyira 21/01/2024 20:45 |
4,089.38 ly | |||
Schee Eaec HC-G a24-0 | 3,994.14 ly |
Irisa Nyira 21/01/2024 20:45 |
3,994.14 ly | |||
Schee Eaec GZ-F a79-1 | 3,376.88 ly |
Irisa Nyira 22/01/2024 23:14 |
3,376.88 ly | |||
Schee Eaec GX-O b12-0 | 4,195.15 ly |
Irisa Nyira 21/01/2024 22:58 |
4,195.15 ly | |||
Schee Eaec GX-D a39-0 | 4,085.97 ly |
Irisa Nyira 22/01/2024 01:07 |
4,085.97 ly | |||
Schee Eaec GW-O a19-1 | 3,698.96 ly |
Irisa Nyira 21/01/2024 20:10 |
3,698.96 ly | |||
Schee Eaec GV-I a91-0 | 3,104.72 ly |
Irisa Nyira 22/01/2024 23:14 |
3,104.72 ly | |||
Schee Eaec GS-P b39-0 | 3,374.09 ly |
Irisa Nyira 22/01/2024 23:14 |
3,374.09 ly | |||
Schee Eaec GS-N c9-2 | 3,989.71 ly |
Irisa Nyira 22/01/2024 22:45 |
3,989.71 ly | |||
Schee Eaec GR-H b2-0 | 3,479.81 ly |
Irisa Nyira 21/01/2024 17:20 |
3,479.81 ly | |||
Schee Eaec GP-U a57-0 | 3,786.49 ly |
Irisa Nyira 22/01/2024 23:14 |
3,786.49 ly | |||
Schee Eaec GO-N a6-0 | 3,771.68 ly |
Irisa Nyira 21/01/2024 17:20 |
3,771.68 ly | |||
Schee Eaec GN-Z a68-2 | 4,318.75 ly |
Irisa Nyira 24/01/2024 22:21 |
4,318.75 ly | |||
Schee Eaec GN-X b7-0 | 4,062.08 ly |
Irisa Nyira 21/01/2024 20:11 |
4,062.08 ly | |||
Schee Eaec GM-R a45-0 | 3,558.88 ly |
Irisa Nyira 21/01/2024 22:58 |
3,558.88 ly | |||
Schee Eaec GK-Y b34-0 | 4,238.62 ly |
Irisa Nyira 24/01/2024 22:21 |
4,238.62 ly | |||
Schee Eaec GK-S a72-0 | 3,903.03 ly |
Irisa Nyira 21/01/2024 22:58 |
3,903.03 ly | |||
Schee Eaec GH-A a96-1 | 3,673.75 ly |
Irisa Nyira 22/01/2024 21:35 |
3,673.75 ly | |||
Schee Eaec GG-O c9-0 | 3,272.61 ly |
Irisa Nyira 21/01/2024 20:45 |
3,272.61 ly | |||
Schee Eaec GE-X a83-0 | 3,430.27 ly |
Irisa Nyira 23/01/2024 01:05 |
3,430.27 ly | |||
Schee Eaec GC-P a115-0 | 3,855.07 ly |
Irisa Nyira 24/01/2024 22:21 |
3,855.07 ly | |||
Schee Eaec GC-K a63-0 | 4,307.02 ly |
Irisa Nyira 23/01/2024 01:30 |
4,307.02 ly | |||
Schee Eaec FY-W b7-0 | 3,913.63 ly |
Irisa Nyira 21/01/2024 20:11 |
3,913.63 ly | |||
Schee Eaec FU-A a82-0 | 4,003.46 ly |
Irisa Nyira 24/01/2024 22:21 |
4,003.46 ly | |||
Schee Eaec FS-X a69-0 | 4,010.15 ly |
Irisa Nyira 23/01/2024 01:31 |
4,010.15 ly | |||
Schee Eaec FS-R d5-7 | 3,495.74 ly |
Irisa Nyira 21/01/2024 22:58 |
3,495.74 ly | |||
Schee Eaec FS-R d5-4 | 3,545.21 ly |
Irisa Nyira 21/01/2024 22:58 |
3,545.21 ly | |||
Schee Eaec FS-J b42-0 | 3,944.71 ly |
Irisa Nyira 22/01/2024 23:14 |
3,944.71 ly | |||
Schee Eaec FS-E a66-0 | 3,668.45 ly |
Irisa Nyira 22/01/2024 23:14 |
3,668.45 ly | |||
Schee Eaec FR-Y c3-1 | 4,119.16 ly |
Irisa Nyira 21/01/2024 20:45 |
4,119.16 ly | |||
Schee Eaec FH-S d5-4 | 3,988.36 ly |
Irisa Nyira 22/01/2024 23:14 |
3,988.36 ly | |||
Schee Eaec FH-S d5-13 | 3,999.22 ly |
Irisa Nyira 22/01/2024 23:14 |
3,999.22 ly | |||
Schee Eaec FF-I a9-0 | 3,408.88 ly |
Irisa Nyira 21/01/2024 17:20 |
3,408.88 ly | |||
Schee Eaec FE-K b14-0 | 3,257.64 ly |
Irisa Nyira 21/01/2024 17:20 |
3,257.64 ly | |||
Schee Eaec FD-Q a87-0 | 3,514.30 ly |
Irisa Nyira 23/01/2024 01:30 |
3,514.30 ly | |||
Schee Eaec FD-N b26-0 | 4,172.59 ly |
Irisa Nyira 22/01/2024 21:35 |
4,172.59 ly | |||
Schee Eaec FD-B a68-1 | 3,346.90 ly |
Irisa Nyira 22/01/2024 22:44 |
3,346.90 ly | |||
Schee Eaec FC-N a20-0 | 3,647.97 ly |
Irisa Nyira 21/01/2024 20:11 |
3,647.97 ly | |||
Schee Eaec EY-Y a27-0 | 3,326.24 ly |
Irisa Nyira 21/01/2024 17:20 |
3,326.24 ly | |||
Schee Eaec EY-S c20-5 | 4,190.04 ly |
Irisa Nyira 24/01/2024 22:21 |
4,190.04 ly | |||
Schee Eaec EY-P d6-8 | 3,080.66 ly |
Irisa Nyira 21/01/2024 22:58 |
3,080.66 ly | |||
Schee Eaec ET-G d11-3 | 3,183.78 ly |
Irisa Nyira 23/01/2024 01:06 |
3,183.78 ly | |||
Schee Eaec ES-R d5-7 | 3,459.03 ly |
Irisa Nyira 21/01/2024 22:58 |
3,459.03 ly | |||
Schee Eaec ES-R d5-3 | 3,406.55 ly |
Irisa Nyira 21/01/2024 22:58 |
3,406.55 ly | |||
Schee Eaec ER-X b7-0 | 3,576.53 ly |
Irisa Nyira 21/01/2024 17:20 |
3,576.53 ly | |||
Schee Eaec ER-O a19-0 | 3,662.84 ly |
Irisa Nyira 21/01/2024 20:11 |
3,662.84 ly | |||
Schee Eaec EO-U b22-0 | 4,048.93 ly |
Irisa Nyira 22/01/2024 23:14 |
4,048.93 ly | |||
Schee Eaec EO-Q a18-0 | 3,236.59 ly |
Irisa Nyira 21/01/2024 17:20 |
3,236.59 ly | |||
Schee Eaec EN-F a38-0 | 4,337.26 ly |
Irisa Nyira 22/01/2024 23:14 |
4,337.26 ly | |||
Schee Eaec EM-Z b6-0 | 4,138.75 ly |
Irisa Nyira 21/01/2024 20:45 |
4,138.75 ly | |||
Schee Eaec EM-D a53-0 | 4,216.32 ly |
Irisa Nyira 23/01/2024 01:05 |
4,216.32 ly | |||
Schee Eaec EL-K a49-0 | 3,628.09 ly |
Irisa Nyira 22/01/2024 22:44 |
3,628.09 ly | |||
Schee Eaec EI-S a17-0 | 3,276.68 ly |
Irisa Nyira 21/01/2024 17:20 |
3,276.68 ly | |||
Schee Eaec EI-E b31-0 | 4,262.07 ly |
Irisa Nyira 23/01/2024 01:30 |
4,262.07 ly | |||
Schee Eaec EG-T a44-0 | 3,587.53 ly |
Irisa Nyira 21/01/2024 22:58 |
3,587.53 ly | |||
Schee Eaec EG-D c29-4 | 3,872.73 ly |
Irisa Nyira 24/01/2024 22:21 |
3,872.73 ly | |||
Schee Eaec EF-S a72-0 | 3,865.32 ly |
Irisa Nyira 23/01/2024 01:05 |
3,865.32 ly | |||
Schee Eaec EF-R c7-1 | 3,236.26 ly |
Irisa Nyira 21/01/2024 20:11 |
3,236.26 ly | |||
Schee Eaec EE-C c2-3 | 3,408.77 ly |
Irisa Nyira 21/01/2024 17:20 |
3,408.77 ly | |||
Schee Eaec ED-E c1-0 | 3,641.63 ly |
Irisa Nyira 21/01/2024 17:20 |
3,641.63 ly | |||
Schee Eaec EC-X c4-0 | 3,983.11 ly |
Irisa Nyira 21/01/2024 20:45 |
3,983.11 ly | |||
Schee Eaec EB-V a98-1 | 4,041.28 ly |
Irisa Nyira 24/01/2024 22:20 |
4,041.28 ly | |||
Schee Eaec DY-E b17-0 | 3,966.32 ly |
Irisa Nyira 21/01/2024 22:58 |
3,966.32 ly | |||
Schee Eaec DW-T d4-12 | 3,984.62 ly |
Irisa Nyira 22/01/2024 22:44 |
3,984.62 ly | |||
Schee Eaec DU-Q c21-5 | 3,814.50 ly |
Irisa Nyira 24/01/2024 22:20 |
3,814.50 ly | |||
Schee Eaec DT-C c15-0 | 3,731.57 ly |
Irisa Nyira 22/01/2024 23:14 |
3,731.57 ly | |||
Schee Eaec DS-H d11-40 | 4,013.61 ly |
Irisa Nyira 24/01/2024 22:21 |
4,013.61 ly | |||
Schee Eaec DR-Y c3-0 | 4,008.68 ly |
Irisa Nyira 21/01/2024 20:45 |
4,008.68 ly | |||
Schee Eaec DR-G a51-0 | 3,274.92 ly |
Irisa Nyira 21/01/2024 22:58 |
3,274.92 ly | |||
Schee Eaec DN-H b2-0 | 3,868.66 ly |
Irisa Nyira 21/01/2024 17:20 |
3,868.66 ly | |||
Schee Eaec DK-L b0 | 3,642.86 ly |
Irisa Nyira 21/01/2024 17:20 |
3,642.86 ly | |||
Schee Eaec DG-O a88-1 | 3,936.62 ly |
Irisa Nyira 24/01/2024 22:21 |
3,936.62 ly | |||
Schee Eaec DB-S b10-0 | 4,201.02 ly |
Irisa Nyira 21/01/2024 20:45 |
4,201.02 ly | |||
Schee Eaec DA-B b6-0 | 3,666.62 ly |
Irisa Nyira 21/01/2024 17:20 |
3,666.62 ly | |||
Schee Eaec CZ-Q c21-0 | 3,847.75 ly |
Irisa Nyira 24/01/2024 22:21 |
3,847.75 ly | |||
Schee Eaec CW-C d10 | 3,751.33 ly |
Irisa Nyira 21/01/2024 17:20 |
3,751.33 ly | |||
Schee Eaec CV-R a86-1 | 4,259.05 ly |
Irisa Nyira 24/01/2024 22:21 |
4,259.05 ly | |||
Schee Eaec CV-L a117-0 | 4,256.83 ly |
Irisa Nyira 22/01/2024 21:35 |
4,256.83 ly | |||
Schee Eaec CS-F c1 | 3,662.28 ly |
Irisa Nyira 21/01/2024 17:20 |
3,662.28 ly | |||
Schee Eaec CR-Z a109-0 | 3,794.48 ly |
Irisa Nyira 24/01/2024 22:21 |
3,794.48 ly | |||
Schee Eaec CQ-F b56-0 | 3,430.44 ly |
Irisa Nyira 24/01/2024 22:20 |
3,430.44 ly | |||
Schee Eaec CQ-A c3-1 | 4,221.21 ly |
Irisa Nyira 21/01/2024 20:45 |
4,221.21 ly | |||
Schee Eaec CN-H b2-0 | 3,843.63 ly |
Irisa Nyira 21/01/2024 17:20 |
3,843.63 ly | |||
Schee Eaec CM-R a100-1 | 3,691.48 ly |
Irisa Nyira 24/01/2024 22:20 |
3,691.48 ly | |||
Schee Eaec CL-J b15-0 | 4,322.21 ly |
Irisa Nyira 21/01/2024 22:58 |
4,322.21 ly | |||
Schee Eaec CK-A a41-0 | 4,222.61 ly |
Irisa Nyira 22/01/2024 23:14 |
4,222.61 ly | |||
Schee Eaec CI-H a92-2 | 3,544.13 ly |
Irisa Nyira 24/01/2024 22:21 |
3,544.13 ly | |||
Schee Eaec CH-Z b6-0 | 4,053.31 ly |
Irisa Nyira 21/01/2024 20:11 |
4,053.31 ly | |||
Schee Eaec CF-Q a32-0 | 3,831.83 ly |
Irisa Nyira 21/01/2024 22:58 |
3,831.83 ly | |||
Schee Eaec CE-X a28-0 | 3,260.87 ly |
Irisa Nyira 21/01/2024 17:20 |
3,260.87 ly | |||
Schee Eaec CD-Q d6-0 | 3,098.95 ly |
Irisa Nyira 21/01/2024 22:58 |
3,098.95 ly | |||
Schee Eaec CC-B d1-3 | 3,434.23 ly |
Irisa Nyira 21/01/2024 17:20 |
3,434.23 ly | |||
Schee Eaec CB-G a24-0 | 3,707.99 ly |
Irisa Nyira 21/01/2024 20:45 |
3,707.99 ly | |||
Schee Eaec CA-N a75-0 | 3,247.24 ly |
Irisa Nyira 22/01/2024 23:14 |
3,247.24 ly | |||
Schee Eaec BZ-S c6-1 | 3,282.05 ly |
Irisa Nyira 21/01/2024 20:11 |
3,282.05 ly | |||
Schee Eaec BZ-I b29-0 | 4,113.15 ly |
Irisa Nyira 23/01/2024 01:05 |
4,113.15 ly | |||
Schee Eaec BY-S c20-0 | 4,055.35 ly |
Irisa Nyira 24/01/2024 22:21 |
4,055.35 ly | |||
Schee Eaec BX-F b30-0 | 4,240.98 ly |
Irisa Nyira 23/01/2024 01:05 |
4,240.98 ly | |||
Schee Eaec BW-Y c3-0 | 4,025.36 ly |
Irisa Nyira 21/01/2024 20:45 |
4,025.36 ly | |||
Schee Eaec BV-F b56-0 | 3,452.93 ly |
Irisa Nyira 24/01/2024 22:20 |
3,452.93 ly | |||
Schee Eaec BT-F d12-5 | 3,307.87 ly |
Irisa Nyira 24/01/2024 22:21 |
3,307.87 ly | |||
Schee Eaec BS-J b42-1 | 3,875.26 ly |
Irisa Nyira 24/01/2024 22:21 |
3,875.26 ly | |||
Schee Eaec BR-L b41-0 | 4,003.00 ly |
Irisa Nyira 24/01/2024 22:20 |
4,003.00 ly | |||
Schee Eaec BQ-R c7-3 | 4,313.30 ly |
Irisa Nyira 21/01/2024 22:58 |
4,313.30 ly | |||
Schee Eaec BQ-Q b11-0 | 3,693.87 ly |
Irisa Nyira 21/01/2024 20:45 |
3,693.87 ly | |||
Schee Eaec BQ-C b46-1 | 3,568.23 ly |
Irisa Nyira 24/01/2024 22:21 |
3,568.23 ly | |||
Schee Eaec BO-E b4-0 | 3,790.42 ly |
Irisa Nyira 21/01/2024 17:20 |
3,790.42 ly | |||
Schee Eaec BM-J d10-30 | 4,091.34 ly |
Irisa Nyira 24/01/2024 22:21 |
4,091.34 ly | |||
Schee Eaec BL-J b1-0 | 3,468.08 ly |
Irisa Nyira 21/01/2024 17:20 |
3,468.08 ly | |||
Schee Eaec BJ-V b49-0 | 3,214.52 ly |
Irisa Nyira 23/01/2024 01:05 |
3,214.52 ly | |||
Schee Eaec BI-X b7-0 | 3,918.55 ly |
Irisa Nyira 21/01/2024 20:11 |
3,918.55 ly | |||
Schee Eaec BH-J d10-1 | 3,977.56 ly |
Irisa Nyira 24/01/2024 22:21 |
3,977.56 ly | |||
Schee Eaec BD-X b48-0 | 3,276.36 ly |
Irisa Nyira 23/01/2024 01:30 |
3,276.36 ly | |||
Schee Eaec BB-Z a27-0 | 4,024.10 ly |
Irisa Nyira 21/01/2024 22:58 |
4,024.10 ly | |||
Schee Eaec BB-I a119-0 | 3,895.63 ly |
Irisa Nyira 24/01/2024 22:21 |
3,895.63 ly | |||
Schee Eaec BB-C a40-0 | 3,505.93 ly |
Irisa Nyira 21/01/2024 22:58 |
3,505.93 ly | |||
Schee Eaec BA-N a75-0 | 3,238.73 ly |
Irisa Nyira 22/01/2024 23:14 |
3,238.73 ly | |||
Schee Eaec AY-P a32-0 | 3,309.62 ly |
Irisa Nyira 21/01/2024 20:11 |
3,309.62 ly | |||
Schee Eaec AX-Y b47-0 | 3,342.95 ly |
Irisa Nyira 23/01/2024 01:30 |
3,342.95 ly | |||
Schee Eaec AV-N c23-2 | 3,659.18 ly |
Irisa Nyira 24/01/2024 22:20 |
3,659.18 ly | |||
Schee Eaec AT-F d12-4 | 3,240.71 ly |
Irisa Nyira 23/01/2024 01:30 |
3,240.71 ly | |||
Schee Eaec AS-D a94-1 | 4,180.33 ly |
Irisa Nyira 21/01/2024 22:58 |
4,180.33 ly | |||
Schee Eaec AR-Q b11-0 | 4,151.21 ly |
Irisa Nyira 21/01/2024 22:58 |
4,151.21 ly | |||
Schee Eaec AP-J b15-0 | 3,832.13 ly |
Irisa Nyira 21/01/2024 22:58 |
3,832.13 ly | |||
Schee Eaec AN-K a104-1 | 4,281.75 ly |
Irisa Nyira 23/01/2024 01:30 |
4,281.75 ly | |||
Schee Eaec AN-H d11-22 | 3,537.22 ly |
Irisa Nyira 24/01/2024 22:20 |
3,537.22 ly | |||
Schee Eaec AL-P c21-1 | 3,084.73 ly |
Irisa Nyira 22/01/2024 23:14 |
3,084.73 ly | |||
Schee Eaec AL-G b58-1 | 3,212.82 ly |
Irisa Nyira 24/01/2024 22:21 |
3,212.82 ly | |||
Schee Eaec AL-C b46-1 | 3,502.84 ly |
Irisa Nyira 24/01/2024 22:21 |
3,502.84 ly | |||
Schee Eaec AK-S b10-0 | 3,740.46 ly |
Irisa Nyira 21/01/2024 20:45 |
3,740.46 ly | |||
Schee Eaec AJ-V b49-0 | 3,181.70 ly |
Irisa Nyira 23/01/2024 01:05 |
3,181.70 ly | |||
Schee Eaec AG-H b29-0 | 3,696.77 ly |
Irisa Nyira 22/01/2024 23:14 |
3,696.77 ly | |||
Schee Eaec AF-H b29-0 | 3,195.95 ly |
Irisa Nyira 21/01/2024 22:58 |
3,195.95 ly | |||
Schee Eaec AE-O a88-0 | 3,408.25 ly |
Irisa Nyira 23/01/2024 01:05 |
3,408.25 ly | |||
Scheau Phoe ZY-N b40-3 | 4,902.99 ly |
Irisa Nyira 26/01/2024 02:48 |
4,902.99 ly | |||
Scheau Phoe ZX-S c20-9 | 5,263.15 ly |
Irisa Nyira 26/01/2024 02:48 |
5,263.15 ly | |||
Scheau Phoe ZW-D a39-0 | 5,256.26 ly |
Irisa Nyira 25/01/2024 01:31 |
5,256.26 ly | |||
Scheau Phoe ZV-X a55-0 | 4,509.13 ly |
Irisa Nyira 25/01/2024 19:34 |
4,509.13 ly | |||
Scheau Phoe ZV-R a86-1 | 4,490.37 ly |
Irisa Nyira 26/01/2024 02:48 |
4,490.37 ly | |||
Scheau Phoe ZT-E a66-0 | 5,362.18 ly |
Irisa Nyira 25/01/2024 19:34 |
5,362.18 ly | |||
Scheau Phoe ZS-A b18-0 | 5,532.41 ly |
Irisa Nyira 21/01/2024 20:11 |
5,532.41 ly | |||
Scheau Phoe ZQ-C d4 | 4,546.58 ly |
Irisa Nyira 21/01/2024 20:11 |
4,546.58 ly | |||
Scheau Phoe ZP-E c28-15 | 4,917.12 ly |
Irisa Nyira 27/01/2024 02:17 |
4,917.12 ly | |||
Scheau Phoe ZO-G c27-14 | 5,147.44 ly |
Irisa Nyira 27/01/2024 01:53 |
5,147.44 ly | |||
Scheau Phoe ZO-E a66-0 | 5,341.41 ly |
Irisa Nyira 25/01/2024 19:34 |
5,341.41 ly | |||
Scheau Phoe ZJ-F b31-1 | 4,646.03 ly |
Irisa Nyira 25/01/2024 19:34 |
4,646.03 ly | |||
Scheau Phoe ZH-W a111-3 | 4,948.92 ly |
Irisa Nyira 27/01/2024 01:52 |
4,948.92 ly | |||
Scheau Phoe ZH-Q b52-3 | 5,246.45 ly |
Irisa Nyira 27/01/2024 01:09 |
5,246.45 ly | |||
Scheau Phoe ZD-N b54-0 | 5,165.62 ly |
Irisa Nyira 27/01/2024 01:53 |
5,165.62 ly | |||
Scheau Phoe ZD-F b45-3 | 5,020.69 ly |
Irisa Nyira 26/01/2024 02:48 |
5,020.69 ly | |||
Scheau Phoe ZB-K b42-1 | 5,180.53 ly |
Irisa Nyira 26/01/2024 02:48 |
5,180.53 ly | |||
Scheau Phoe ZA-P a60-1 | 4,563.09 ly |
Irisa Nyira 25/01/2024 19:34 |
4,563.09 ly | |||
Scheau Phoe YX-N a102-1 | 4,829.35 ly |
Irisa Nyira 27/01/2024 01:09 |
4,829.35 ly | |||
Scheau Phoe YS-K b28-1 | 5,373.76 ly |
Irisa Nyira 25/01/2024 19:34 |
5,373.76 ly | |||
Scheau Phoe YS-J a63-1 | 4,441.12 ly |
Irisa Nyira 25/01/2024 19:34 |
4,441.12 ly | |||
Scheau Phoe YS-E b59-7 | 5,359.61 ly |
Irisa Nyira 27/01/2024 02:16 |
5,359.61 ly | |||
Scheau Phoe YP-X c17-5 | 4,413.46 ly |
Irisa Nyira 26/01/2024 01:11 |
4,413.46 ly | |||
Scheau Phoe YO-M b54-2 | 5,017.96 ly |
Irisa Nyira 27/01/2024 01:53 |
5,017.96 ly | |||
Scheau Phoe YN-Q a73-0 | 4,522.91 ly |
Irisa Nyira 25/01/2024 19:34 |
4,522.91 ly | |||
Scheau Phoe YM-I c26-6 | 4,335.84 ly |
Irisa Nyira 26/01/2024 21:39 |
4,335.84 ly | |||
Scheau Phoe YM-A b47-0 | 5,101.71 ly |
Irisa Nyira 26/01/2024 02:49 |
5,101.71 ly | |||
Scheau Phoe YJ-G c27-8 | 5,029.12 ly |
Irisa Nyira 27/01/2024 01:53 |
5,029.12 ly | |||
Scheau Phoe YJ-G c27-12 | 5,033.24 ly |
Irisa Nyira 27/01/2024 01:53 |
5,033.24 ly | |||
Scheau Phoe YJ-G c27-11 | 5,028.50 ly |
Irisa Nyira 27/01/2024 01:53 |
5,028.50 ly | |||
Scheau Phoe YI-Y b34-0 | 4,808.39 ly |
Irisa Nyira 26/01/2024 01:11 |
4,808.39 ly | |||
Scheau Phoe YI-I c26-8 | 5,292.37 ly |
Irisa Nyira 27/01/2024 01:10 |
5,292.37 ly | |||
Scheau Phoe YI-A a41-0 | 5,167.25 ly |
Irisa Nyira 23/01/2024 01:30 |
5,167.25 ly | |||
Scheau Phoe YG-K b42-0 | 5,195.43 ly |
Irisa Nyira 25/01/2024 19:34 |
5,195.43 ly | |||
Scheau Phoe YF-D b46-4 | 5,391.18 ly |
Irisa Nyira 26/01/2024 02:48 |
5,391.18 ly | |||
Scheau Phoe YD-F b45-2 | 4,998.31 ly |
Irisa Nyira 26/01/2024 02:49 |
4,998.31 ly | |||
Scheau Phoe YC-W a111-0 | 4,920.58 ly |
Irisa Nyira 27/01/2024 01:53 |
4,920.58 ly | |||
Scheau Phoe YA-W e2-7 | 4,425.29 ly |
Irisa Nyira 25/01/2024 19:34 |
4,425.29 ly | |||
Scheau Phoe YA-J a91-0 | 4,530.35 ly |
Irisa Nyira 26/01/2024 02:48 |
4,530.35 ly | |||
Scheau Phoe XZ-W d2-10 | 5,115.34 ly |
Irisa Nyira 22/01/2024 00:49 |
5,115.34 ly | |||
Scheau Phoe XZ-W d2-1 | 5,076.69 ly |
Irisa Nyira 22/01/2024 00:49 |
5,076.69 ly | |||
Scheau Phoe XW-X b48-3 | 4,623.41 ly |
Irisa Nyira 26/01/2024 21:39 |
4,623.41 ly | |||
Scheau Phoe XT-O b52-0 | 4,858.44 ly |
Irisa Nyira 27/01/2024 01:10 |
4,858.44 ly | |||
Scheau Phoe XT-M b54-0 | 5,047.50 ly |
Irisa Nyira 27/01/2024 01:53 |
5,047.50 ly | |||
Scheau Phoe XS-X b48-1 | 5,099.75 ly |
Irisa Nyira 26/01/2024 21:39 |
5,099.75 ly | |||
Scheau Phoe XQ-A b19-0 | 5,272.07 ly |
Irisa Nyira 25/01/2024 01:31 |
5,272.07 ly | |||
Scheau Phoe XO-X a69-0 | 4,424.19 ly |
Irisa Nyira 25/01/2024 19:34 |
4,424.19 ly | |||
Scheau Phoe XO-G c27-19 | 5,083.51 ly |
Irisa Nyira 27/01/2024 01:53 |
5,083.51 ly | |||
Scheau Phoe XO-E a66-0 | 5,322.22 ly |
Irisa Nyira 25/01/2024 19:34 |
5,322.22 ly | |||
Scheau Phoe XN-G a65-1 | 5,387.40 ly |
Irisa Nyira 25/01/2024 19:34 |
5,387.40 ly | |||
Scheau Phoe XM-V b8-0 | 4,480.46 ly |
Irisa Nyira 21/01/2024 00:30 |
4,480.46 ly | |||
Scheau Phoe XM-J a22-0 | 4,454.68 ly |
Irisa Nyira 22/01/2024 00:48 |
4,454.68 ly | |||
Scheau Phoe XM-H d11-30 | 4,612.57 ly |
Irisa Nyira 26/01/2024 02:49 |
4,612.57 ly | |||
Scheau Phoe XL-R b38-1 | 4,522.21 ly |
Irisa Nyira 26/01/2024 01:11 |
4,522.21 ly | |||
Scheau Phoe XL-F c14-4 | 5,342.57 ly |
Irisa Nyira 25/01/2024 19:34 |
5,342.57 ly | |||
Scheau Phoe XK-S c6-1 | 5,125.92 ly |
Irisa Nyira 23/01/2024 01:30 |
5,125.92 ly | |||
Scheau Phoe XK-S c6-0 | 5,120.75 ly |
Irisa Nyira 23/01/2024 01:30 |
5,120.75 ly | |||
Scheau Phoe XJ-G b56-0 | 4,777.30 ly |
Irisa Nyira 27/01/2024 01:52 |
4,777.30 ly | |||
Scheau Phoe XI-S d4-0 | 5,556.21 ly |
Irisa Nyira 22/01/2024 00:49 |
5,556.21 ly | |||
Scheau Phoe XI-O a88-2 | 4,640.81 ly |
Irisa Nyira 26/01/2024 02:48 |
4,640.81 ly | |||
Scheau Phoe XI-N b54-4 | 5,172.47 ly |
Irisa Nyira 27/01/2024 01:53 |
5,172.47 ly | |||
Scheau Phoe XI-A d1-0 | 5,628.10 ly |
Irisa Nyira 21/01/2024 20:11 |
5,628.10 ly | |||
Scheau Phoe XA-H c13-10 | 5,426.17 ly |
Irisa Nyira 25/01/2024 01:31 |
5,426.17 ly | |||
Scheau Phoe WY-L b13-0 | 4,893.43 ly |
Irisa Nyira 23/01/2024 01:30 |
4,893.43 ly | |||
Scheau Phoe WX-F d12-49 | 4,336.17 ly |
Irisa Nyira 26/01/2024 21:39 |
4,336.17 ly | |||
Scheau Phoe WU-N c23-5 | 4,761.51 ly |
Irisa Nyira 26/01/2024 21:39 |
4,761.51 ly | |||
Scheau Phoe WT-M b54-3 | 5,032.58 ly |
Irisa Nyira 27/01/2024 01:53 |
5,032.58 ly | |||
Scheau Phoe WT-I c12-1 | 4,521.29 ly |
Irisa Nyira 25/01/2024 01:30 |
4,521.29 ly | |||
Scheau Phoe WR-H d11-35 | 4,686.60 ly |
Irisa Nyira 26/01/2024 02:48 |
4,686.60 ly | |||
Scheau Phoe WQ-C d13-8 | 4,772.01 ly |
Irisa Nyira 26/01/2024 21:39 |
4,772.01 ly | |||
Scheau Phoe WP-T b50-1 | 4,787.05 ly |
Irisa Nyira 27/01/2024 01:10 |
4,787.05 ly | |||
Scheau Phoe WO-G b56-0 | 4,794.80 ly |
Irisa Nyira 27/01/2024 01:52 |
4,794.80 ly | |||
Scheau Phoe WN-J b15-0 | 4,486.85 ly |
Irisa Nyira 22/01/2024 00:48 |
4,486.85 ly | |||
Scheau Phoe WM-T b49-1 | 4,967.18 ly |
Irisa Nyira 26/01/2024 21:38 |
4,967.18 ly | |||
Scheau Phoe WM-P b39-1 | 4,376.22 ly |
Irisa Nyira 26/01/2024 01:11 |
4,376.22 ly | |||
Scheau Phoe WL-K b42-4 | 5,204.11 ly |
Irisa Nyira 26/01/2024 02:48 |
5,204.11 ly | |||
Scheau Phoe WJ-L b55-0 | 5,026.35 ly |
Irisa Nyira 27/01/2024 01:52 |
5,026.35 ly | |||
Scheau Phoe WH-D c28-1 | 5,221.04 ly |
Irisa Nyira 27/01/2024 01:52 |
5,221.04 ly | |||
Scheau Phoe WG-X b7-0 | 4,553.63 ly |
Irisa Nyira 22/01/2024 00:48 |
4,553.63 ly | |||
Scheau Phoe WF-C b46-0 | 4,638.99 ly |
Irisa Nyira 26/01/2024 02:48 |
4,638.99 ly | |||
Scheau Phoe WC-Y b48-3 | 5,152.79 ly |
Irisa Nyira 26/01/2024 21:39 |
5,152.79 ly | |||
Scheau Phoe WC-V b22-2 | 5,264.46 ly |
Irisa Nyira 25/01/2024 01:31 |
5,264.46 ly | |||
Scheau Phoe WA-H c13-3 | 5,392.29 ly |
Irisa Nyira 25/01/2024 01:30 |
5,392.29 ly | |||
Scheau Phoe VZ-D b4-0 | 5,263.85 ly |
Irisa Nyira 21/01/2024 20:11 |
5,263.85 ly | |||
Scheau Phoe VY-P b25-0 | 4,539.50 ly |
Irisa Nyira 25/01/2024 19:34 |
4,539.50 ly | |||
Scheau Phoe VU-K a35-1 | 5,616.12 ly |
Irisa Nyira 22/01/2024 00:49 |
5,616.12 ly | |||
Scheau Phoe VS-Y a27-0 | 4,421.12 ly |
Irisa Nyira 23/01/2024 01:31 |
4,421.12 ly | |||
Scheau Phoe VS-S a58-1 | 4,371.75 ly |
Irisa Nyira 25/01/2024 19:34 |
4,371.75 ly | |||
Scheau Phoe VS-K b27-0 | 4,501.62 ly |
Irisa Nyira 25/01/2024 19:34 |
4,501.62 ly | |||
Scheau Phoe VR-K c9-0 | 5,551.50 ly |
Irisa Nyira 22/01/2024 00:48 |
5,551.50 ly | |||
Scheau Phoe VP-S c6-2 | 5,129.13 ly |
Irisa Nyira 23/01/2024 01:30 |
5,129.13 ly | |||
Scheau Phoe VP-O e6-4 | 4,765.94 ly |
Irisa Nyira 27/01/2024 01:52 |
4,765.94 ly | |||
Scheau Phoe VP-O e6-3 | 4,789.87 ly |
Irisa Nyira 27/01/2024 01:52 |
4,789.87 ly | |||
Scheau Phoe VN-S d4-3 | 5,539.80 ly |
Irisa Nyira 22/01/2024 00:48 |
5,539.80 ly | |||
Scheau Phoe VN-K b27-0 | 4,474.21 ly |
Irisa Nyira 25/01/2024 19:34 |
4,474.21 ly | |||
Scheau Phoe VM-M b27-3 | 5,402.49 ly |
Irisa Nyira 25/01/2024 01:30 |
5,402.49 ly | |||
Scheau Phoe VM-L c24-9 | 5,321.99 ly |
Irisa Nyira 26/01/2024 21:38 |
5,321.99 ly | |||
Scheau Phoe VJ-O a88-0 | 4,875.88 ly |
Irisa Nyira 26/01/2024 02:48 |
4,875.88 ly | |||
Scheau Phoe VG-O a33-1 | 5,186.58 ly |
Irisa Nyira 23/01/2024 01:31 |
5,186.58 ly | |||
Scheau Phoe VG-I a119-5 | 5,371.32 ly |
Irisa Nyira 27/01/2024 02:17 |
5,371.32 ly | |||
Scheau Phoe VF-L d9-1 | 5,220.52 ly |
Irisa Nyira 26/01/2024 01:12 |
5,220.52 ly | |||
Scheau Phoe VE-Y a55-3 | 5,514.21 ly |
Irisa Nyira 25/01/2024 01:31 |
5,514.21 ly | |||
Scheau Phoe VE-X d2-15 | 5,111.20 ly |
Irisa Nyira 22/01/2024 00:48 |
5,111.20 ly | |||
Scheau Phoe VE-X d2-14 | 5,095.89 ly |
Irisa Nyira 22/01/2024 00:48 |
5,095.89 ly | |||
Scheau Phoe VE-X d2-1 | 5,094.28 ly |
Irisa Nyira 23/01/2024 01:30 |
5,094.28 ly | |||
Scheau Phoe VE-C c2-1 | 5,249.05 ly |
Irisa Nyira 21/01/2024 20:11 |
5,249.05 ly | |||
Scheau Phoe VD-I c26-8 | 5,089.60 ly |
Irisa Nyira 27/01/2024 01:10 |
5,089.60 ly | |||
Scheau Phoe VD-I c26-2 | 5,061.28 ly |
Irisa Nyira 27/01/2024 01:10 |
5,061.28 ly | |||
Scheau Phoe VC-T c20-5 | 5,181.27 ly |
Irisa Nyira 26/01/2024 02:48 |
5,181.27 ly | |||
Scheau Phoe VB-I b57-5 | 5,422.01 ly |
Irisa Nyira 27/01/2024 01:53 |
5,422.01 ly | |||
Scheau Phoe UT-S b51-3 | 4,367.16 ly |
Irisa Nyira 26/01/2024 21:39 |
4,367.16 ly | |||
Scheau Phoe UT-I b28-0 | 4,359.72 ly |
Irisa Nyira 25/01/2024 19:34 |
4,359.72 ly | |||
Scheau Phoe US-Q b51-1 | 4,926.62 ly |
Irisa Nyira 27/01/2024 01:10 |
4,926.62 ly | |||
Scheau Phoe US-I a105-0 | 5,431.58 ly |
Irisa Nyira 26/01/2024 21:39 |
5,431.58 ly | |||
Scheau Phoe UR-L c24-6 | 5,348.40 ly |
Irisa Nyira 22/01/2024 02:01 |
5,348.40 ly | |||
Scheau Phoe UR-G a106-0 | 4,860.24 ly |
Irisa Nyira 27/01/2024 01:09 |
4,860.24 ly | |||
Scheau Phoe UP-X a69-1 | 4,642.04 ly |
Irisa Nyira 25/01/2024 19:34 |
4,642.04 ly | |||
Scheau Phoe UO-C b18-0 | 4,828.92 ly |
Irisa Nyira 25/01/2024 01:30 |
4,828.92 ly | |||
Scheau Phoe UN-Y b34-2 | 4,781.61 ly |
Irisa Nyira 26/01/2024 01:11 |
4,781.61 ly | |||
Scheau Phoe UN-Q b51-0 | 4,878.42 ly |
Irisa Nyira 27/01/2024 01:10 |
4,878.42 ly | |||
Scheau Phoe UM-Z b47-3 | 5,112.53 ly |
Irisa Nyira 26/01/2024 21:39 |
5,112.53 ly | |||
Scheau Phoe UL-B d14-15 | 4,765.89 ly |
Irisa Nyira 27/01/2024 01:52 |
4,765.89 ly | |||
Scheau Phoe UK-W c18-4 | 4,350.44 ly |
Irisa Nyira 26/01/2024 01:11 |
4,350.44 ly | |||
Scheau Phoe UK-I a50-0 | 4,449.02 ly |
Irisa Nyira 25/01/2024 01:31 |
4,449.02 ly | |||
Scheau Phoe UJ-X d2-12 | 5,219.54 ly |
Irisa Nyira 22/01/2024 00:31 |
5,219.54 ly | |||
Scheau Phoe UI-R c21-5 | 4,973.91 ly |
Irisa Nyira 26/01/2024 02:48 |
4,973.91 ly | |||
Scheau Phoe UI-R c21-0 | 4,958.34 ly |
Irisa Nyira 26/01/2024 02:48 |
4,958.34 ly | |||
Scheau Phoe UI-E a80-0 | 5,477.08 ly |
Irisa Nyira 26/01/2024 01:11 |
5,477.08 ly | |||
Scheau Phoe UI-A b20-0 | 4,462.64 ly |
Irisa Nyira 25/01/2024 01:30 |
4,462.64 ly | |||
Scheau Phoe UH-J a77-0 | 4,561.12 ly |
Irisa Nyira 26/01/2024 01:11 |
4,561.12 ly | |||
Scheau Phoe UF-Z b6-0 | 4,633.53 ly |
Irisa Nyira 22/01/2024 00:32 |
4,633.53 ly | |||
Scheau Phoe UE-J a91-0 | 5,511.68 ly |
Irisa Nyira 26/01/2024 02:48 |
5,511.68 ly | |||
Scheau Phoe UE-F b57-0 | 4,749.33 ly |
Irisa Nyira 27/01/2024 02:16 |
4,749.33 ly | |||
Scheau Phoe UD-H b30-1 | 4,628.12 ly |
Irisa Nyira 25/01/2024 19:34 |
4,628.12 ly | |||
Scheau Phoe UB-J d10-16 | 4,514.85 ly |
Irisa Nyira 26/01/2024 02:48 |
4,514.85 ly | |||
Scheau Phoe UB-J d10-13 | 4,499.93 ly |
Irisa Nyira 26/01/2024 02:48 |
4,499.93 ly | |||
Scheau Phoe UA-K b14-0 | 5,235.66 ly |
Irisa Nyira 23/01/2024 01:30 |
5,235.66 ly | |||
Scheau Phoe UA-F b57-0 | 5,220.67 ly |
Irisa Nyira 27/01/2024 01:52 |
5,220.67 ly | |||
Scheau Phoe TZ-O e6-11 | 5,230.54 ly |
Irisa Nyira 27/01/2024 01:53 |
5,230.54 ly | |||
Scheau Phoe TY-X a110-2 | 5,428.32 ly |
Irisa Nyira 27/01/2024 01:09 |
5,428.32 ly | |||
Scheau Phoe TY-G b56-0 | 4,806.79 ly |
Irisa Nyira 27/01/2024 01:53 |
4,806.79 ly | |||
Scheau Phoe TY-F b44-0 | 4,767.73 ly |
Irisa Nyira 22/01/2024 00:49 |
4,767.73 ly | |||
Scheau Phoe TW-K c9-0 | 5,534.45 ly |
Irisa Nyira 22/01/2024 00:49 |
5,534.45 ly | |||
Scheau Phoe TW-D b32-3 | 5,519.10 ly |
Irisa Nyira 25/01/2024 19:34 |
5,519.10 ly | |||
Scheau Phoe TU-S c6-2 | 5,123.45 ly |
Irisa Nyira 23/01/2024 01:31 |
5,123.45 ly | |||
Scheau Phoe TU-Q a59-0 | 4,550.62 ly |
Irisa Nyira 25/01/2024 19:34 |
4,550.62 ly | |||
Scheau Phoe TU-O e6-0 | 4,865.67 ly |
Irisa Nyira 27/01/2024 01:52 |
4,865.67 ly | |||
Scheau Phoe TS-S d4-7 | 5,518.89 ly |
Irisa Nyira 22/01/2024 00:48 |
5,518.89 ly | |||
Scheau Phoe TS-S d4-1 | 5,496.96 ly |
Irisa Nyira 22/01/2024 00:48 |
5,496.96 ly | |||
Scheau Phoe TS-Q b51-1 | 4,903.59 ly |
Irisa Nyira 27/01/2024 01:10 |
4,903.59 ly | |||
Scheau Phoe TR-L c24-16 | 5,308.84 ly |
Irisa Nyira 26/01/2024 21:39 |
5,308.84 ly | |||
Scheau Phoe TQ-X a14-0 | 4,738.91 ly |
Irisa Nyira 22/01/2024 00:31 |
4,738.91 ly | |||
Scheau Phoe TQ-C b46-2 | 5,160.70 ly |
Irisa Nyira 26/01/2024 02:49 |
5,160.70 ly | |||
Scheau Phoe TO-F a93-1 | 4,914.28 ly |
Irisa Nyira 26/01/2024 02:48 |
4,914.28 ly | |||
Scheau Phoe TM-R c6-0 | 5,557.11 ly |
Irisa Nyira 21/01/2024 20:11 |
5,557.11 ly | |||
Scheau Phoe TM-G b58-3 | 5,335.40 ly |
Irisa Nyira 27/01/2024 02:16 |
5,335.40 ly | |||
Scheau Phoe TI-A b20-0 | 4,438.23 ly |
Irisa Nyira 25/01/2024 01:30 |
4,438.23 ly | |||
Scheau Phoe TF-Z b6-0 | 4,607.22 ly |
Irisa Nyira 22/01/2024 00:32 |
4,607.22 ly | |||
Scheau Phoe TE-V b49-2 | 4,768.10 ly |
Irisa Nyira 26/01/2024 21:39 |
4,768.10 ly | |||
Scheau Phoe TE-F b45-4 | 5,413.68 ly |
Irisa Nyira 26/01/2024 02:48 |
5,413.68 ly | |||
Scheau Phoe TE-E b4-0 | 5,268.66 ly |
Irisa Nyira 21/01/2024 20:11 |
5,268.66 ly | |||
Scheau Phoe SZ-O e6-11 | 4,982.39 ly |
Irisa Nyira 27/01/2024 02:17 |
4,982.39 ly | |||
Scheau Phoe SZ-E c28-0 | 4,796.92 ly |
Irisa Nyira 25/01/2024 01:31 |
4,796.92 ly | |||
Scheau Phoe SZ-B a95-0 | 4,574.08 ly |
Irisa Nyira 26/01/2024 02:48 |
4,574.08 ly | |||
Scheau Phoe SW-S a113-1 | 5,572.95 ly |
Irisa Nyira 27/01/2024 01:09 |
5,572.95 ly | |||
Scheau Phoe SU-U b8-0 | 5,221.12 ly |
Irisa Nyira 22/01/2024 00:31 |
5,221.12 ly | |||
Scheau Phoe SS-G b57-3 | 5,063.54 ly |
Irisa Nyira 27/01/2024 02:17 |
5,063.54 ly | |||
Scheau Phoe SQ-Z b47-3 | 4,602.49 ly |
Irisa Nyira 26/01/2024 21:39 |
4,602.49 ly | |||
Scheau Phoe SO-Q e5-6 | 5,311.38 ly |
Irisa Nyira 26/01/2024 02:48 |
5,311.38 ly | |||
Scheau Phoe SN-M a34-0 | 5,368.76 ly |
Irisa Nyira 23/01/2024 01:30 |
5,368.76 ly | |||
Scheau Phoe SM-M b26-0 | 4,526.08 ly |
Irisa Nyira 25/01/2024 19:34 |
4,526.08 ly | |||
Scheau Phoe SL-X a14-0 | 4,710.90 ly |
Irisa Nyira 21/01/2024 00:30 |
4,710.90 ly | |||
Scheau Phoe SL-V b48-0 | 4,990.61 ly |
Irisa Nyira 26/01/2024 21:38 |
4,990.61 ly | |||
Scheau Phoe SL-I b43-2 | 4,489.82 ly |
Irisa Nyira 26/01/2024 02:48 |
4,489.82 ly | |||
Scheau Phoe SK-N a116-2 | 4,436.54 ly |
Irisa Nyira 27/01/2024 01:53 |
4,436.54 ly | |||
Scheau Phoe SI-G b57-0 | 4,970.98 ly |
Irisa Nyira 27/01/2024 02:16 |
4,970.98 ly | |||
Scheau Phoe SH-P b53-1 | 5,202.03 ly |
Irisa Nyira 27/01/2024 01:10 |
5,202.03 ly | |||
Scheau Phoe SE-E a80-1 | 4,439.22 ly |
Irisa Nyira 26/01/2024 02:48 |
4,439.22 ly | |||
Scheau Phoe SD-F b17-0 | 5,550.41 ly |
Irisa Nyira 22/01/2024 00:48 |
5,550.41 ly | |||
Scheau Phoe SA-U b50-0 | 5,314.70 ly |
Irisa Nyira 26/01/2024 21:38 |
5,314.70 ly | |||
Scheau Phoe RX-K c24-6 | 4,911.74 ly |
Irisa Nyira 26/01/2024 21:38 |
4,911.74 ly | |||
Scheau Phoe RT-O d7-41 | 5,542.75 ly |
Irisa Nyira 25/01/2024 19:34 |
5,542.75 ly | |||
Scheau Phoe RS-T a85-1 | 5,212.48 ly |
Irisa Nyira 26/01/2024 02:48 |
5,212.48 ly | |||
Scheau Phoe RR-L b53-0 | 4,882.58 ly |
Irisa Nyira 27/01/2024 01:09 |
4,882.58 ly | |||
Scheau Phoe RP-V d3-6 | 4,629.49 ly |
Irisa Nyira 25/01/2024 01:31 |
4,629.49 ly | |||
Scheau Phoe RP-R b23-0 | 4,703.65 ly |
Irisa Nyira 25/01/2024 01:31 |
4,703.65 ly | |||
Scheau Phoe RN-K c11-4 | 4,492.07 ly |
Irisa Nyira 25/01/2024 01:30 |
4,492.07 ly | |||
Scheau Phoe RM-H b57-1 | 5,209.38 ly |
Irisa Nyira 27/01/2024 02:16 |
5,209.38 ly | |||
Scheau Phoe RM-G b58-6 | 5,307.50 ly |
Irisa Nyira 26/01/2024 02:49 |
5,307.50 ly | |||
Scheau Phoe RM-B b18-0 | 5,537.28 ly |
Irisa Nyira 21/01/2024 20:10 |
5,537.28 ly | |||
Scheau Phoe RL-I b43-2 | 4,466.97 ly |
Irisa Nyira 26/01/2024 02:48 |
4,466.97 ly | |||
Scheau Phoe RL-C c1-0 | 5,635.59 ly |
Irisa Nyira 21/01/2024 20:11 |
5,635.59 ly | |||
Scheau Phoe RJ-M b54-2 | 4,838.76 ly |
Irisa Nyira 27/01/2024 01:52 |
4,838.76 ly | |||
Scheau Phoe RJ-D b59-0 | 4,916.39 ly |
Irisa Nyira 27/01/2024 02:17 |
4,916.39 ly | |||
Scheau Phoe RH-U d3-4 | 5,544.31 ly |
Irisa Nyira 21/01/2024 20:11 |
5,544.31 ly | |||
Scheau Phoe RH-P b53-4 | 5,189.87 ly |
Irisa Nyira 27/01/2024 01:10 |
5,189.87 ly | |||
Scheau Phoe RH-P b53-2 | 5,184.56 ly |
Irisa Nyira 27/01/2024 01:10 |
5,184.56 ly | |||
Scheau Phoe RG-X b7-0 | 4,455.18 ly |
Irisa Nyira 22/01/2024 00:31 |
4,455.18 ly | |||
Scheau Phoe RG-P a115-1 | 4,969.50 ly |
Irisa Nyira 27/01/2024 02:16 |
4,969.50 ly | |||
Scheau Phoe RF-U b50-1 | 5,324.01 ly |
Irisa Nyira 26/01/2024 21:38 |
5,324.01 ly | |||
Scheau Phoe RC-E c27-2 | 4,780.29 ly |
Irisa Nyira 27/01/2024 01:10 |
4,780.29 ly | |||
Scheau Phoe RA-Q b24-0 | 4,663.83 ly |
Irisa Nyira 25/01/2024 01:31 |
4,663.83 ly | |||
Scheau Phoe QZ-J b56-0 | 4,932.58 ly |
Irisa Nyira 26/01/2024 02:48 |
4,932.58 ly | |||
Scheau Phoe QZ-D b45-0 | 4,586.13 ly |
Irisa Nyira 26/01/2024 02:48 |
4,586.13 ly | |||
Scheau Phoe QY-G b44-0 | 5,432.83 ly |
Irisa Nyira 26/01/2024 02:48 |
5,432.83 ly | |||
Scheau Phoe QW-J a8-1 | 5,227.93 ly |
Irisa Nyira 21/01/2024 20:11 |
5,227.93 ly | |||
Scheau Phoe QV-J a118-1 | 5,334.30 ly |
Irisa Nyira 27/01/2024 02:16 |
5,334.30 ly | |||
Scheau Phoe QU-V d3-10 | 4,780.58 ly |
Irisa Nyira 22/01/2024 00:31 |
4,780.58 ly | |||
Scheau Phoe QU-K a35-0 | 5,561.07 ly |
Irisa Nyira 23/01/2024 01:30 |
5,561.07 ly | |||
Scheau Phoe QT-J b56-4 | 4,375.78 ly |
Irisa Nyira 27/01/2024 01:52 |
4,375.78 ly | |||
Scheau Phoe QS-K b27-0 | 4,404.61 ly |
Irisa Nyira 25/01/2024 19:34 |
4,404.61 ly | |||
Scheau Phoe QP-W a97-0 | 5,174.34 ly |
Irisa Nyira 26/01/2024 21:38 |
5,174.34 ly | |||
Scheau Phoe QP-V d3-17 | 4,590.56 ly |
Irisa Nyira 23/01/2024 01:31 |
4,590.56 ly | |||
Scheau Phoe QN-K b27-0 | 4,376.66 ly |
Irisa Nyira 25/01/2024 19:34 |
4,376.66 ly | |||
Scheau Phoe QN-I c26-3 | 5,034.08 ly |
Irisa Nyira 26/01/2024 02:48 |
5,034.08 ly | |||
Scheau Phoe QK-E b45-1 | 5,193.29 ly |
Irisa Nyira 26/01/2024 02:48 |
5,193.29 ly | |||
Scheau Phoe QI-F b17-0 | 5,561.77 ly |
Irisa Nyira 22/01/2024 00:48 |
5,561.77 ly | |||
Scheau Phoe QH-L c24-5 | 5,022.38 ly |
Irisa Nyira 22/01/2024 00:12 |
5,022.38 ly | |||
Scheau Phoe QG-F c27-3 | 5,223.06 ly |
Irisa Nyira 27/01/2024 01:09 |
5,223.06 ly | |||
Scheau Phoe QG-B b47-1 | 5,121.57 ly |
Irisa Nyira 26/01/2024 02:48 |
5,121.57 ly | |||
Scheau Phoe QF-Y c17-10 | 5,360.14 ly |
Irisa Nyira 25/01/2024 19:34 |
5,360.14 ly | |||
Scheau Phoe QF-C d14-28 | 5,114.70 ly |
Irisa Nyira 27/01/2024 02:16 |
5,114.70 ly | |||
Scheau Phoe QE-L b0 | 4,535.46 ly |
Irisa Nyira 21/01/2024 20:11 |
4,535.46 ly | |||
Scheau Phoe QE-I a64-1 | 4,590.18 ly |
Irisa Nyira 25/01/2024 19:34 |
4,590.18 ly | |||
Scheau Phoe QD-Z d1-7 | 5,236.37 ly |
Irisa Nyira 22/01/2024 00:31 |
5,236.37 ly | |||
Scheau Phoe QD-E b59-2 | 5,075.19 ly |
Irisa Nyira 27/01/2024 02:17 |
5,075.19 ly | |||
Scheau Phoe QA-R c7-0 | 4,860.21 ly |
Irisa Nyira 23/01/2024 01:30 |
4,860.21 ly | |||
Scheau Phoe QA-Q b25-1 | 5,455.97 ly |
Irisa Nyira 25/01/2024 01:31 |
5,455.97 ly | |||
Scheau Phoe QA-D c29-1 | 4,513.68 ly |
Irisa Nyira 27/01/2024 02:16 |
4,513.68 ly | |||
Scheau Phoe PZ-W b34-0 | 4,337.64 ly |
Irisa Nyira 25/01/2024 19:34 |
4,337.64 ly | |||
Scheau Phoe PZ-I c12-6 | 5,368.94 ly |
Irisa Nyira 25/01/2024 01:30 |
5,368.94 ly | |||
Scheau Phoe PY-M c9-2 | 5,246.17 ly |
Irisa Nyira 25/01/2024 01:31 |
5,246.17 ly | |||
Scheau Phoe PY-M c9-0 | 5,241.91 ly |
Irisa Nyira 25/01/2024 01:31 |
5,241.91 ly | |||
Scheau Phoe PX-B c16-0 | 4,701.31 ly |
Irisa Nyira 25/01/2024 19:34 |
4,701.31 ly | |||
Scheau Phoe PW-T a71-0 | 4,497.12 ly |
Irisa Nyira 26/01/2024 01:11 |
4,497.12 ly | |||
Scheau Phoe PU-L b13-0 | 5,236.32 ly |
Irisa Nyira 22/01/2024 00:48 |
5,236.32 ly | |||
Scheau Phoe PO-S a58-1 | 4,545.31 ly |
Irisa Nyira 25/01/2024 19:34 |
4,545.31 ly | |||
Scheau Phoe PN-R a100-2 | 5,330.23 ly |
Irisa Nyira 26/01/2024 21:39 |
5,330.23 ly | |||
Scheau Phoe PL-X a14-0 | 4,681.21 ly |
Irisa Nyira 22/01/2024 00:32 |
4,681.21 ly | |||
Scheau Phoe PJ-L c10-2 | 5,163.51 ly |
Irisa Nyira 25/01/2024 01:31 |
5,163.51 ly | |||
Scheau Phoe PJ-L c10-0 | 5,164.37 ly |
Irisa Nyira 25/01/2024 01:31 |
5,164.37 ly | |||
Scheau Phoe PH-A b34-2 | 4,767.54 ly |
Irisa Nyira 25/01/2024 19:34 |
4,767.54 ly | |||
Scheau Phoe PG-Y c3-0 | 4,540.51 ly |
Irisa Nyira 22/01/2024 00:48 |
4,540.51 ly | |||
Scheau Phoe PF-X b47-0 | 5,010.21 ly |
Irisa Nyira 26/01/2024 21:39 |
5,010.21 ly | |||
Scheau Phoe PF-R c7-0 | 4,884.83 ly |
Irisa Nyira 23/01/2024 01:31 |
4,884.83 ly | |||
Scheau Phoe PF-H b30-2 | 5,551.26 ly |
Irisa Nyira 25/01/2024 01:31 |
5,551.26 ly | |||
Scheau Phoe PF-C d14-41 | 5,038.35 ly |
Irisa Nyira 27/01/2024 02:16 |
5,038.35 ly | |||
Scheau Phoe OW-W c4-0 | 4,509.19 ly |
Irisa Nyira 22/01/2024 00:49 |
4,509.19 ly | |||
Scheau Phoe OW-S b50-0 | 4,976.16 ly |
Irisa Nyira 26/01/2024 21:39 |
4,976.16 ly | |||
Scheau Phoe OT-O d7-37 | 5,305.52 ly |
Irisa Nyira 25/01/2024 19:34 |
5,305.52 ly | |||
Scheau Phoe OS-A b59-0 | 4,776.55 ly |
Irisa Nyira 27/01/2024 02:17 |
4,776.55 ly | |||
Scheau Phoe OR-M c23-1 | 4,955.29 ly |
Irisa Nyira 26/01/2024 21:38 |
4,955.29 ly | |||
Scheau Phoe OQ-Z a109-0 | 4,900.59 ly |
Irisa Nyira 27/01/2024 01:53 |
4,900.59 ly | |||
Scheau Phoe OQ-W c18-5 | 5,231.28 ly |
Irisa Nyira 26/01/2024 01:11 |
5,231.28 ly | |||
Scheau Phoe OQ-F b31-2 | 5,502.29 ly |
Irisa Nyira 25/01/2024 19:34 |
5,502.29 ly | |||
Scheau Phoe OP-S b51-3 | 4,715.56 ly |
Irisa Nyira 27/01/2024 01:09 |
4,715.56 ly | |||
Scheau Phoe ON-E b17-0 | 4,847.16 ly |
Irisa Nyira 25/01/2024 01:30 |
4,847.16 ly | |||
Scheau Phoe OL-Y b58-0 | 4,805.89 ly |
Irisa Nyira 27/01/2024 01:53 |
4,805.89 ly | |||
Scheau Phoe OJ-Y a96-0 | 5,195.25 ly |
Irisa Nyira 26/01/2024 21:39 |
5,195.25 ly | |||
Scheau Phoe OJ-T b22-0 | 4,726.67 ly |
Irisa Nyira 25/01/2024 01:30 |
4,726.67 ly | |||
Scheau Phoe OJ-O b39-0 | 4,471.25 ly |
Irisa Nyira 26/01/2024 01:12 |
4,471.25 ly | |||
Scheau Phoe OJ-D b59-2 | 4,863.09 ly |
Irisa Nyira 27/01/2024 02:16 |
4,863.09 ly | |||
Scheau Phoe OJ-B a54-1 | 4,484.36 ly |
Irisa Nyira 25/01/2024 19:34 |
4,484.36 ly | |||
Scheau Phoe OG-J b56-2 | 5,223.09 ly |
Irisa Nyira 27/01/2024 01:52 |
5,223.09 ly | |||
Scheau Phoe OF-C d14-50 | 4,953.25 ly |
Irisa Nyira 26/01/2024 21:38 |
4,953.25 ly | |||
Scheau Phoe OF-C d14-48 | 4,981.37 ly |
Irisa Nyira 27/01/2024 02:16 |
4,981.37 ly | |||
Scheau Phoe OF-C d14-47 | 4,944.31 ly |
Irisa Nyira 27/01/2024 02:16 |
4,944.31 ly | |||
Scheau Phoe OF-C d14-4 | 4,952.45 ly |
Irisa Nyira 27/01/2024 02:16 |
4,952.45 ly | |||
Scheau Phoe OF-C d14-25 | 5,010.79 ly |
Irisa Nyira 27/01/2024 02:16 |
5,010.79 ly | |||
Scheau Phoe OD-Z d1-14 | 5,071.72 ly |
Irisa Nyira 22/01/2024 00:48 |
5,071.72 ly | |||
Scheau Phoe OD-Q b25-1 | 4,458.24 ly |
Irisa Nyira 25/01/2024 01:30 |
4,458.24 ly | |||
Scheau Phoe OC-P c8-1 | 5,531.55 ly |
Irisa Nyira 22/01/2024 00:49 |
5,531.55 ly | |||
Scheau Phoe OC-C b58-0 | 4,777.38 ly |
Irisa Nyira 27/01/2024 01:53 |
4,777.38 ly | |||
Scheau Phoe NZ-X a110-0 | 4,365.42 ly |
Irisa Nyira 27/01/2024 01:09 |
4,365.42 ly | |||
Scheau Phoe NZ-V b49-1 | 5,338.60 ly |
Irisa Nyira 26/01/2024 21:38 |
5,338.60 ly | |||
Scheau Phoe NZ-D d13-23 | 5,178.38 ly |
Irisa Nyira 27/01/2024 01:09 |
5,178.38 ly | |||
Scheau Phoe NX-I b55-1 | 4,813.24 ly |
Irisa Nyira 27/01/2024 01:53 |
4,813.24 ly | |||
Scheau Phoe NT-U a43-0 | 4,411.42 ly |
Irisa Nyira 25/01/2024 01:31 |
4,411.42 ly | |||
Scheau Phoe NT-G c27-1 | 4,760.24 ly |
Irisa Nyira 27/01/2024 01:53 |
4,760.24 ly | |||
Scheau Phoe NS-K c11-2 | 4,438.37 ly |
Irisa Nyira 22/01/2024 00:32 |
4,438.37 ly | |||
Scheau Phoe NR-I b56-2 | 5,079.65 ly |
Irisa Nyira 27/01/2024 01:53 |
5,079.65 ly | |||
Scheau Phoe NQ-H b54-0 | 4,754.44 ly |
Irisa Nyira 26/01/2024 21:38 |
4,754.44 ly | |||
Scheau Phoe NP-P a46-0 | 5,309.51 ly |
Irisa Nyira 25/01/2024 01:31 |
5,309.51 ly | |||
Scheau Phoe NP-D d13-8 | 4,886.67 ly |
Irisa Nyira 27/01/2024 01:10 |
4,886.67 ly | |||
Scheau Phoe NP-D d13-14 | 4,853.04 ly |
Irisa Nyira 27/01/2024 01:10 |
4,853.04 ly | |||
Scheau Phoe NL-T c5-1 | 5,580.20 ly |
Irisa Nyira 21/01/2024 20:11 |
5,580.20 ly | |||
Scheau Phoe NL-L c9-0 | 5,530.44 ly |
Irisa Nyira 22/01/2024 00:48 |
5,530.44 ly | |||
Scheau Phoe NJ-T b23-1 | 5,528.60 ly |
Irisa Nyira 25/01/2024 01:31 |
5,528.60 ly | |||
Scheau Phoe NI-Z a68-1 | 4,363.32 ly |
Irisa Nyira 25/01/2024 19:34 |
4,363.32 ly | |||
Scheau Phoe NH-C c29-4 | 5,049.74 ly |
Irisa Nyira 27/01/2024 01:53 |
5,049.74 ly | |||
Scheau Phoe NG-Z b6-0 | 4,993.18 ly |
Irisa Nyira 22/01/2024 00:32 |
4,993.18 ly | |||
Scheau Phoe NF-C d14-60 | 4,875.56 ly |
Irisa Nyira 27/01/2024 02:16 |
4,875.56 ly | |||
Scheau Phoe ND-A c17-3 | 4,474.04 ly |
Irisa Nyira 25/01/2024 19:34 |
4,474.04 ly | |||
Scheau Phoe NB-W d2-4 | 5,543.79 ly |
Irisa Nyira 21/01/2024 20:11 |
5,543.79 ly | |||
Scheau Phoe NB-W d2-2 | 5,564.83 ly |
Irisa Nyira 21/01/2024 20:11 |
5,564.83 ly | |||
Scheau Phoe NB-T b37-1 | 4,870.57 ly |
Irisa Nyira 26/01/2024 01:12 |
4,870.57 ly | |||
Scheau Phoe NB-K a8-0 | 5,215.77 ly |
Irisa Nyira 21/01/2024 20:11 |
5,215.77 ly | |||
Scheau Phoe MZ-X a110-2 | 4,357.88 ly |
Irisa Nyira 27/01/2024 01:10 |
4,357.88 ly | |||
Scheau Phoe MZ-M d8-10 | 4,824.96 ly |
Irisa Nyira 26/01/2024 01:11 |
4,824.96 ly | |||
Scheau Phoe MY-M c9-2 | 5,149.70 ly |
Irisa Nyira 25/01/2024 01:31 |
5,149.70 ly | |||
Scheau Phoe MY-M c9-1 | 5,145.50 ly |
Irisa Nyira 25/01/2024 01:31 |
5,145.50 ly | |||
Scheau Phoe MX-A d1-9 | 5,264.19 ly |
Irisa Nyira 21/01/2024 20:11 |
5,264.19 ly | |||
Scheau Phoe MT-M a34-1 | 5,591.95 ly |
Irisa Nyira 22/01/2024 00:48 |
5,591.95 ly | |||
Scheau Phoe MR-E c27-2 | 4,852.70 ly |
Irisa Nyira 27/01/2024 01:09 |
4,852.70 ly | |||
Scheau Phoe MQ-G b55-0 | 4,812.73 ly |
Irisa Nyira 27/01/2024 01:10 |
4,812.73 ly | |||
Scheau Phoe MO-X d2-18 | 4,764.74 ly |
Irisa Nyira 23/01/2024 01:30 |
4,764.74 ly | |||
Scheau Phoe MO-X d2-10 | 4,718.25 ly |
Irisa Nyira 23/01/2024 01:30 |
4,718.25 ly | |||
Scheau Phoe MO-I b55-1 | 5,224.72 ly |
Irisa Nyira 27/01/2024 01:09 |
5,224.72 ly | |||
Scheau Phoe MM-R a100-1 | 5,042.05 ly |
Irisa Nyira 26/01/2024 21:39 |
5,042.05 ly | |||
Scheau Phoe ML-O c22-4 | 4,997.13 ly |
Irisa Nyira 26/01/2024 02:48 |
4,997.13 ly | |||
Scheau Phoe ML-N a61-0 | 4,421.52 ly |
Irisa Nyira 25/01/2024 19:34 |
4,421.52 ly | |||
Scheau Phoe ML-L c9-0 | 5,488.25 ly |
Irisa Nyira 22/01/2024 00:49 |
5,488.25 ly | |||
Scheau Phoe MK-L a76-1 | 5,560.69 ly |
Irisa Nyira 25/01/2024 19:34 |
5,560.69 ly | |||
Scheau Phoe MK-L a76-0 | 5,566.76 ly |
Irisa Nyira 25/01/2024 19:34 |
5,566.76 ly | |||
Scheau Phoe MK-C d14-31 | 5,013.68 ly |
Irisa Nyira 27/01/2024 02:17 |
5,013.68 ly | |||
Scheau Phoe MK-B b47-1 | 4,572.65 ly |
Irisa Nyira 26/01/2024 02:48 |
4,572.65 ly | |||
Scheau Phoe MJ-X d2-7 | 4,606.18 ly |
Irisa Nyira 23/01/2024 01:31 |
4,606.18 ly | |||
Scheau Phoe MI-S e4-2 | 5,014.83 ly |
Irisa Nyira 26/01/2024 02:48 |
5,014.83 ly | |||
Scheau Phoe MH-C c29-4 | 5,023.74 ly |
Irisa Nyira 27/01/2024 02:17 |
5,023.74 ly | |||
Scheau Phoe MG-A a96-1 | 4,734.14 ly |
Irisa Nyira 26/01/2024 21:39 |
4,734.14 ly |